Pearl Gas-to-Liquids, the world's largest GTL plant producing 260k barrels per day, faced early-stage asset integrity and reliability challenges that threatened throughput and operational performance.
Qatar Shell GTL deployed over 45 4IR solutions, including AI for structural integrity monitoring, and empowered frontline teams with digital tools to improve asset management and operational decision-making.
The site increased throughput by 9%, improved reliability to 99%, cut emissions by 7%, and extended equipment life by up to 50% within a five-year period.
Have a similar implementation?
Share your customer's AI results and link it to your vendor profile.
Submit a case study →