Favicon of Rockwell Automation

Optima OEM Slashes Changeover Times Up to 50% with iTRAK System (North America)

A documented Process Optimization in Packaging deployment at Optima Packaging Group, with source-attributed results and missing evidence labelled explicitly.

Maintained by Peter Korpak, Founder & Chief AnalystHow evidence is checked

Evidence at a glance

Evidence status:
Source-extracted record
Deployment timeframe:
Not reported by source
Reported outcome metrics:
1 cited below
Directory entry published:

The source-link check confirms reachability, not independent re-verification of every claim.

Up to 50%Changeover time reduction

Source-reported figures — cited source: rockwellautomation.com

The Challenge

Optima needed to address market demand for flexible, agile packaging with rapid format changeover without operator mechanical adjustments.

The Solution

Allen-Bradley ControlLogix PAC with iTRAK Intelligent Track System. Connected Enterprise architecture for OEE monitoring.

Results

Changeover times reduced by up to 50%. Increased OEE. Increased flexibility for format and product variation. Less operator interaction. Access to Connected Enterprise.

Key Takeaways

Applying independent cart technology to pharmaceutical and consumer products packaging machines delivers 50% changeover reduction while enabling Connected Enterprise data visibility for remote monitoring.

Share:

Details

Industry
Packaging
AI Technology
Not available in record
Company Size
MidMarket
Evidence status
Source-extracted record
Deployment timeframe
Not reported by source
Directory entry published

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.

Submit a case study →