Optima OEM Slashes Changeover Times Up to 50% with iTRAK System (North America)
“Optima OEM Slashes Changeover Times Up to 50% with iTRAK System (North America)” documents a Process Optimization deployment in Packaging at Optima Packaging Group. rockwellautomation.com reports changeover time reduction: Up to 50%; this directory has not independently verified that result.
Evidence at a glance
- Evidence status:
- Source-extracted record
- Deployment timeframe:
- Not reported by source
- Reported outcome metrics:
- 1 cited below
- Directory entry published:
The source-link check confirms reachability, not independent re-verification of every claim.
Source-reported figures — cited source: rockwellautomation.com
The Challenge
Optima needed to address market demand for flexible, agile packaging with rapid format changeover without operator mechanical adjustments.
The Solution
Allen-Bradley ControlLogix PAC with iTRAK Intelligent Track System. Connected Enterprise architecture for OEE monitoring.
Results
Changeover times reduced by up to 50%. Increased OEE. Increased flexibility for format and product variation. Less operator interaction. Access to Connected Enterprise.
Key Takeaways
Applying independent cart technology to pharmaceutical and consumer products packaging machines delivers 50% changeover reduction while enabling Connected Enterprise data visibility for remote monitoring.
Vendor
Details
- Industry
- Packaging
- Use Case
- Process Optimization
- AI Technology
- Not available in record
- Company Size
- MidMarket
- Company
- Optima Packaging Group
- Evidence status
- Source-extracted record
- Deployment timeframe
- Not reported by source
- Directory entry published
Cited source
rockwellautomation.comHave a similar implementation?
Share your customer's AI results and link it to your vendor profile.
Submit a case study →