Favicon of Rockwell Automation

Optima Packaging Group

Optima OEM Slashes Changeover Times Up to 50% with iTRAK System (North America)

Up to 50%Changeover time reduction

The Challenge

Optima needed to address market demand for flexible, agile packaging with rapid format changeover without operator mechanical adjustments.

The Solution

Allen-Bradley ControlLogix PAC with iTRAK Intelligent Track System. Connected Enterprise architecture for OEE monitoring.

Results

Changeover times reduced by up to 50%. Increased OEE. Increased flexibility for format and product variation. Less operator interaction. Access to Connected Enterprise.

Key Takeaways

Applying independent cart technology to pharmaceutical and consumer products packaging machines delivers 50% changeover reduction while enabling Connected Enterprise data visibility for remote monitoring.

Share:

Details

Industry
Packaging
Company Size
MidMarket
Quality
Scraped

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.

Submit a case study →