Millenkamp Cattle

Millenkamp Cattle Idaho Dairy Redefines Efficiency and Sustainability with PlantPAx

30 minutes per cycleCIP cycle time reduction
More than 50%Chemical usage cost reduction
30,000 headHerd size

The Challenge

Need to optimize operation and maintenance of complex milking operations at a 30,000-head dairy farm with fragmented control and monitoring systems.

The Solution

PlantPAx Distributed Control System providing centralized monitoring and control across all milking operations with consistent operator interface.

Results

Centralized monitoring and control with consistent interface. Reduced troubleshooting and downtime. CIP system cycle time decreased by 30 minutes. Chemical usage and related costs cut by more than 50%.

Key Takeaways

Implementing a unified DCS across a large-scale dairy operation centralizes monitoring, reduces CIP cycle times by 30 minutes per cycle, and halves chemical costs through more precise, automated chemical management.