Favicon of Rockwell Automation

Manufacturer

Manufacturer Implements Assembly Schedule

The Challenge

A major manufacturer of household appliances wanted to redesign a significant portion of its refrigerator-liner final assembly process, as well as create and implement an effective and appropriate production schedule for that process. A manufacturing simulation model was developed using Arena. The highly-detailed model evaluated the dynamic flows of products through the system, including material handling as well as production operations.

The Solution

A manufacturing simulation model was developed using Arena. The highly-detailed model evaluated the dynamic flows of products through the system, including material handling as well as production operations.

Results

By running an anticipated production schedule, the manufacturer was able to find a design with the minimum system resources necessary to meet production goals.

Key Takeaways

Technology: Digital Twin. Industry: Food & Beverage.

Share:

Details

AI Technology
Digital Twin
Quality
Verified

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.

Submit a case study →