Lotte Wedel Achieves 50% Throughput Increase with iTRAK Intelligent Track System

Lotte Wedel implemented a Process Optimization project in Food & Beverage. As reported by rockwellautomation.com: 50% throughput increase.

Maintained by Peter Korpak, Lead EditorHow evidence is checked
50%Throughput increase

Source-reported figures (cited source: rockwellautomation.com)

What Lotte Wedel was trying to fix

Polish confectionery company's packaging machine had infeed and carton pusher mechanically linked, with individual dwell times limiting overall machine speed. High maintenance downtime impacted asset utilization.

What Lotte Wedel deployed

iTRAK Intelligent Track System with Allen-Bradley controllers programmed in a single integrated software environment. Separated infeed and carton pusher to enable independent dwell times.

Results

50% throughput increase. Reduced machine downtime. Increased performance and improved asset utilization.

Key Takeaways

At Lotte Wedel, replacing the mechanically linked infeed and carton pusher with independent cart technology raised throughput 50% by decoupling dwell times, so each station runs at its optimal speed.

Evidence for Lotte Wedel's Process Optimization deployment

Reported outcome metrics
1 cited below
Last updated

Share:

Details

AI Technology
Not available in record
Company Size
MidMarket

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.

Submit a case study →