Kraft Heinz Ore-Ida Model Predictive Control: 10%+ Capacity Gain

Kraft Heinz's Ore-Ida plant in Oregon added Rockwell Automation's FactoryTalk Analytics PavilionX model predictive control software from peeling through packaging. Rockwell's 2017 case study reports that capacity rose over 10 percent after a three-month evaluation, against a 5 percent goal, with a projected 12 to 16 month payback on the software and control upgrade. The source describes model predictive control but does not say whether its models use machine learning, and it gives no baseline throughput, cost, or independent measurement.

Maintained by Peter Korpak, Lead EditorHow evidence is checked
Over 10%Capacity increase
12-16 monthsProjected payback

Source-reported figures (cited source: Rockwell Automation)

What Kraft Heinz (Ore-Ida) was trying to fix

The Ore-Ida plant in Ontario, Oregon makes about 800 million pounds of frozen potato products a year across nearly 200 SKUs, running continuously up to 310 days. On its largest line each process was controlled separately, so a peeling problem starved later stages and a packaging problem backed up the line, sending excess product to a holding crib where fries could break up. Staff hesitated to raise production rates, and the control system was no longer supported by its manufacturer. These problems come from Rockwell Automation's July 6, 2017 case study. Rockwell has since removed the page; this summary follows the Internet Archive copy captured on May 16, 2026. The source gives no baseline throughput or yield.

How Ore-Ida uses model predictive control

Management asked the plant to justify the control upgrade, so Rockwell Automation ran an engagement study that gathered quality and production data as a baseline and identified a 5 percent productivity opportunity using model predictive control (MPC). According to Rockwell Automation, the team then configured FactoryTalk Analytics PavilionX MPC software to capture operating parameters from peeling through packaging. It runs as a layer on top of the existing automation system, predicts conditions in the process areas and line, and adjusts continuously. The source's examples include tightening downstream settings after a spike in defects, adjusting upstream processes when packaging is constrained, ramping up peeling after an unloading-dock lag, and tracking warm-weather effects on freezing. The source does not say whether the models use machine learning, and it gives no software cost.

Capacity and payback reported by Rockwell

Rockwell Automation reports these outcomes at the Ore-Ida plant:

  • Capacity: after an initial three-month evaluation, the improvement topped 10 percent, against the 5 percent goal.
  • Payback: Rockwell says the investment in both the MPC software and the full control-architecture upgrade should be recovered in 12 to 16 months. This is a projection.
  • Variability: trend graphs showed less variability under MPC than without it, and texture tests leveled off. The plant had no quality benchmark data to compare against.

This is a vendor-published 2017 account quoting plant staff. It gives no baseline throughput, measurement method, software or upgrade cost, or later results.

Checks to make before buying model predictive control

Before buying model predictive control, put these questions to the vendor:

  • Ask for the engagement-study baseline and how the capacity gain was measured: which throughput measure, over what period, and whether the gain held after the three-month evaluation. The source reports "over 10 percent" without these details.
  • Ask how the process model is built, validated and maintained when the product mix changes. The plant runs nearly 200 SKUs, and the source does not say how the model handles them or whether it learns from data. These are evaluation questions, not reported Ore-Ida results.
  • Ask how much of the 12 to 16 month payback comes from the MPC software and how much from the control-architecture upgrade. Rockwell reports one combined figure.

Compare other process-control and analytics deployments in the process-optimization evidence, or browse Food & Beverage deployments.

Evidence for Ore-Ida's model predictive control deployment

Reported capacity gain
Over 10% after a three-month evaluation, against a 5% goal
Directory published
Source published

Share:

Details

AI Technology
Not established by the source
Company Size
Not reported by source

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.