Favicon of Rockwell Automation

iTRAK

iTRAK Helps Machine Builder Slash Changeover Times By Up To 50%

50%Decreased format changeover times – as much as

The Challenge

Optima needed to help its customer address market demand for more flexible and agile packaging solutions

The Solution

A Rockwell Automation Integrated Architecture Solution Allen‑Bradley ControlLogix PAC iTRAK Intelligent Track System

Results

Decreased format changeover times – as much as 50% Increased overall equipment effectiveness (OEE) Higher throughput and reduced bottleneck

Key Takeaways

  • Decreased format changeover times – as much as 50%
  • Increased overall equipment effectiveness (OEE)
  • Higher throughput and reduced bottleneck

Share:

Details

Company Size
SME
Company
iTRAK
Quality
Scraped

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.

Submit a case study →