A major manufacturer of household appliances wanted to redesign a significant portion of its refrigerator-liner final assembly process, as well as create and implement an effective and appropriate production schedule for that process. A manufacturing simulation model was developed using Arena. The highly-detailed model evaluated the dynamic flows of products through the system, including material handling as well as production operations. By running an anticipated production schedule, the manufacturer was able to find a design with the minimum system resources necessary to meet production goal
A manufacturing simulation model was developed using Arena. The highly-detailed model evaluated the dynamic flows of products through the system, including material handling as well as production operations. By running an anticipated production schedule, the manufacturer was able to find a design with the minimum system resources necessary to meet production goals.
By running an anticipated production schedule, the manufacturer was able to find a design with the minimum system resources necessary to meet production goals.
Technology used: Digital Twin.
Have a similar implementation?
Share your customer's AI results and link it to your vendor profile.
Submit a case study →