Thai Biomass Plant

Thai Biomass Plant Improves Energy Efficiency

The Challenge

Build a DCS power plant system, the first of its kind in Thailand, with an efficient and reliable system to reduce waste and losses.

The Solution

The ‘Process System Estimator’ (PSE) design tool The DCS & Web Reporting System The Integrated Architecture that includes FactoryTalk® Historian to collect critical time-series data for various calculations, estimations, and statistical processes producing information

Results

Improved reliability, reduced wiring and installation costs Redundant system ensures consistent, reliable production and precise data reporting Ease of operation for employees

Key Takeaways

  • Improved reliability, reduced wiring and installation costs
  • Redundant system ensures consistent, reliable production and precise data reporting
  • Ease of operation for employees