Prodesa Cuts 1,000 Hours of Engineering Time Using PlantPAx

Prodesa deployed Digital Twin for Process Optimization in Energy & Utilities. As reported by rockwellautomation.com: 1,000 hours/project engineering time saved.

Maintained by Peter Korpak, Lead EditorHow evidence is checked
1,000 hours/projectEngineering Time Saved

Source-reported figures — cited source: rockwellautomation.com

What Prodesa was trying to fix

Prodesa, a wood pellet plant engineering company, faced excessive engineering hours in designing and commissioning control systems for pellet production facilities. Repetitive engineering work on similar projects consumed resources and extended project timelines.

What Prodesa deployed

Prodesa standardized on PlantPAx DCS with pre-configured library objects and templates that could be reused across wood pellet plant projects. The standardized platform and reusable engineering assets eliminated redundant design work on successive projects.

Results

Prodesa saved 1,000 hours of engineering time per project by leveraging PlantPAx's library-based design approach. The time savings accelerated project delivery timelines and improved profitability by reducing the labor content in each wood pellet plant implementation.

Key Takeaways

Engineering firms that standardize on library-based DCS platforms accumulate intellectual property in reusable objects that compounds in value across successive projects. Saving 1,000 hours per project through code reuse represents a significant competitive advantage in engineering services pricing. Wood pellet plant automation benefits from standardized control templates due to the similar process architecture shared across facilities.

Evidence for Prodesa's Process Optimization deployment

Reported outcome metrics
1 cited below
Last updated

Share:

Details

AI Technology
Digital Twin
Company Size
SME
Company
Prodesa

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.

Submit a case study →