Favicon of Rockwell Automation

LLOG Exploration

LLOG Achieves 99% Uptime with Virtualized PlantPAx DCS on Offshore Floating Production System

98%Uptime in first year

The Challenge

Industry-leading build and implementation schedule for new offshore floating production system required a reliable, flexible DCS deployable within tight construction timeline.

The Solution

Virtualized PlantPAx DCS with integrated security and production intelligence. Scalable virtualized system for easy expandability and integration of new equipment.

Results

98% uptime achieved in first year of implementation. Enhanced reporting reduces downtime and expedites troubleshooting.

Key Takeaways

Virtualized DCS for offshore floating production systems delivers 98%+ uptime by enabling rapid troubleshooting through enhanced reporting while providing scalability for equipment additions without physical infrastructure changes.

Share:

Details

Company Size
MidMarket
Quality
Scraped

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.

Submit a case study →