Kasa Reduces Baggage Handling System Commissioning from 6 Weeks to 6 Days with Emulate3D

4-6 weeks to 6 daysOn-site commissioning time reduction

The Challenge

Designing, testing and implementing baggage handling systems (BHS) required extensive on-site commissioning time, with FAT testing done physically and requiring weeks of on-site work.

The Solution

Emulate3D digital emulation software enabling remote and multiple scenario testing during Factory Acceptance Test. Customized testing tools developed to optimize the testing process.

Results

Multiple scenarios testable quickly and remotely during FAT. Supports development of customized testing tools. On-site commissioning and startup time reduced from 4-6 weeks to 6 days.

Key Takeaways

Digital emulation of baggage handling systems compresses on-site commissioning from 6 weeks to 6 days — an 85%+ reduction — by enabling comprehensive remote FAT testing that resolves issues before on-site deployment.

Share:

Details

AI Technology
Digital Twin
Company Size
SME
Company
Kasa
Quality
Scraped

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.

Submit a case study →