Zanini Renk faced significant challenges in factory operations with a lack of visibility and accuracy in scheduling, resulting in daily firefighting and missed deadlines. They had no way to determine their Overall Equipment Effectiveness and lacked real-time shop floor visibility.
Zanini Renk implemented Opcenter Execution Discrete for real-time shop floor visibility and Opcenter Advanced Planning and Scheduling (APS) for detailed production scheduling. The integrated solution enabled tracking raw materials through to finished goods with precision and transparency.
Within two years, OEE increased from 45% to 71%. The organization experienced a cultural shift with teams embracing data-driven decisions. The company gained holistic visibility across operations, increased credibility and accuracy in delivery timelines, and overcame local limitations to make decisions on a global scale.
Have a similar implementation?
Share your customer's AI results and link it to your vendor profile.
Submit a case study →