Winstone Wallboards needed to design, install, and commission a smart safety solution to grow capacity and reliability at its plaster mill. The existing safety system caused downtime through failures, limiting production capacity and making fault-finding difficult.
Allen-Bradley GuardLogix, Guardshield POC Safety Light Curtains, Guardmaster 442G Multifunctional Access Box, and Studio 5000 Logix Designer were deployed with integrated safety control over EtherNet/IP to create zone separation and access control.
Fault-finding improved significantly. Downtime due to safety system failure was reduced, resulting in an OEE improvement of 0.3%. Equipment availability increased to produce for an additional 24 hours per year. The solution meets AS/NZ Standard 4024.