Improve Personnel Training Procedures

A mine deployed Digital Twin for Energy Management in Metals & Mining. rockwellautomation.com reports no complete outcome metric.

Maintained by Peter Korpak, Lead EditorHow evidence is checked

What the mine was trying to fix

Sustain up to three expeditionary operations, simultaneously, in potentially three different theatres of operation. Arena Simulation was built to review the different stages and time it takes to move through the various sections and ensure positions could be filled. The concept model built shows projections for shortages in various positions. This allows for planning to train and fill these positions to avoid absences.

What the mine deployed

When running the operational sustainability model, there are two options: to restrict the pool of nominees to those in deployable units (the model default), or to allow all deployable members regardless of their unit type to be eligible for selection. The aim of running the model is to identify potential shortages of positions (and by association personnel) in the CF establishment by unit, occupation and rank. The shortages identified in the model can be of two types: the position was filled but an operational waiver had to be signed, or the position could not be filled at all. In the latter c

Results

The concept model built shows projections for shortages in various positions. This allows for planning to train and fill these positions to avoid absences.

Key Takeaways

Technology used: Digital Twin.

Evidence for the mine's Energy Management deployment

Reported outcome metrics
Not reported by source
Last updated

Limitation: The cited source does not identify the company.

Share:

Details

AI Technology
Digital Twin
Company Size
SME
Company
Mine

Have a similar implementation?

Share your customer's AI results and link it to your vendor profile.

Submit a case study →